Built to order in İzmir.
Supported in your time zone.
Factory-direct coffee roasters from 2 to 60 kg, with 60 Hz configurations confirmed for your project. Sales, spare parts, technical support and commissioning for U.S. roasteries — one contact, from first question to first roast.
Can Umsu, U.S. Sales · based in İzmir · replies within one business day
Three services. One manufacturer behind all of them.
Sales, built to your spec
Every machine is manufactured in İzmir for your site. Voltage, frequency, heating, controls, colour and options are confirmed for the selected model. Request a comparison of factory and delivered pricing, with the available shipping terms stated in writing.
Configure a machine →Spare parts & technical support
Wear parts shipped by air from the factory; remote diagnosis over the controller; a response‑time commitment written into your proposal. Support hours overlap the U.S. business day.
Request a part or open a ticket →Commissioning & training
Start‑up on your floor: utility checks, first fire, profile set‑up and operator training. On‑site by a GARANTİ engineer or guided remotely for shop roasters — scope defined before you order.
See commissioning & training →Shop roasters fly. Industrial systems sail.
PACIFICA 2, PACIFICA 5 and FOCHA ship by air freight; routing and timing are confirmed in your proposal. ATLANTICA systems travel by sea with crating, port handling and inland rigging arranged in advance.
- 01 Configure and confirm in writingModel, utilities, options, compliance responsibilities, delivery and commissioning scope. 1–2 weeks
- 02 Built to order in İzmirManufactured for your 60 Hz site. Photos and test‑run video before dispatch. 6–10 weeks*
- 03 Air freight — PACIFICA 2, PACIFICA 5, FOCHACrated at the factory, flown to your nearest airport, customs cleared by our broker. 5–10 days
- 04 Sea freight — ATLANTICA 20 / 30 / 60Container from İzmir to a U.S. port, inland leg and rigging arranged in advance. 5–8 weeks
- 05 Commissioning and trainingUtility checks, first fire, profiles, operator training — on site or guided remotely. 1–3 days
| Model | Batch | Shipping | 60 Hz | Commissioning | |
|---|---|---|---|---|---|
| FOCHA | Sample / shop | Air freight | Yes | Remote | Explore → |
| PACIFICA 2 | 2 kg | Air freight | 208 V / 220–240 V | Remote or on site | Explore → |
| PACIFICA 5 | 5 kg | Air freight | 208 V / 220–240 V | Remote or on site | Explore → |
| ATLANTICA 20 / 30 / 60 | 20–60 kg | Sea freight | Project‑specific | On site, GARANTİ engineer | Explore → |
Lead times are indicative and confirmed in the written proposal.
Import terms, said out loud.
The hesitation about buying from Türkiye is rarely about the machine. It is about what arrives on the invoice afterwards. So we itemise it.
Quoted both ways
Compare factory and delivered pricing. Available delivery terms, destination costs and responsibilities are confirmed in your written proposal.
Duty itemised, not buried
HTS classification, duty and any additional tariff as their own lines, checked with a licensed customs broker before you sign.
Freight and rigging named
Airport or port, inland leg, liftgate or rigging — and who is standing at the door when the truck arrives.
Parts and response time
Which spares ship with the machine, which are stocked for the U.S., and the response‑time commitment in writing.
Is your site ready?
Tick what you already know. Whatever stays unticked is the short list we work through together — and the text below becomes your project brief.
Copy this brief and paste it into the message in your quote request.

“I manage every U.S. project myself — from the first configuration question to the day your roaster is commissioned.”
Based in İzmir, Türkiye · replies within one business day for U.S. inquiries
Straight answers.
Can GARANTİ supply a roaster configured for a U.S. facility?+
Yes. PACIFICA 2 and PACIFICA 5 are built for 60 Hz at 208 V or 220–240 V. Share phase, fuel, gas pressure and local approval requirements and the full configuration is confirmed in writing.
How fast can a shop roaster arrive?+
PACIFICA 2, PACIFICA 5 and FOCHA ship by air freight — typically 5–10 days from factory dispatch to your nearest airport, customs cleared. ATLANTICA systems travel by sea in 5–8 weeks.
Is a UL or ETL mark always required?+
It varies by jurisdiction. The local authority may ask for an NRTL listing or a field evaluation. We tell you what applies to your address before you order — this page does not claim a U.S. listing for every model.
What happens when I need a part or something goes wrong?+
Remote diagnosis over the controller first; wear parts fly from the factory; the response‑time commitment is written into your proposal.
Are GARANTİ roasters compatible with Artisan and Modbus?+
Yes. Control systems support Modbus and are used with Artisan in the field. Ask for the model‑specific set‑up guide with your quotation.
Planning a roastery in the United States?
Send the city, state, target capacity, utilities and timing. We start with a configuration and readiness review — before any price.



